ROCK HILL MECHANICAL CORPORATION has reduced the cost of projects across the country and internationally thru the use of modularized systems and pre-assembled pipe bridges. By fabricating in a controlled off-site environment, better quality is ensured. A project’s Critical Path can be fast-tracked by allowing parallel construction schedules to run simultaneously between the field and the fabrication shop. On-site manpower and crew sizes as well as craft expertise can be better managed due to the decreased amount of field work required. The following corporations have realized the myriad of savings through the use of Rock Hill Mechanical’s experience in modularization and pre-assembly.